Windows


Dry wall, paint, flooring, cabling.


Stars & Stripes - So many classy views from the VNET Building


Inside a 3rd floor office


Drywall


Heavy Lifting Made Easy


Bruce Crane – This Business Was His Destiny


Server Cabinets


Server Cabinets - Keep Out!




No mishaps if you can believe it.




That's a lot of glass!


Two of these are not server cabinets.




Enter the Dragon


Dale had to verify each and every cabinet to make sure we received what was ordered. This was no small task at this scale.


HVAC Equipment – Going Up




The top of the elevator shaft has been lowered.


4th Floor


4th Floor


The building gets a fresh coat of paint on the east wall and bump out.


1st Coat of Blacktop


Fiber vault on 11th Street.


The Generator on top (tan), the fuel tank on the bottom (black). Dang!


The paint has had time to set. Sheen is reduced.


Future Welcome Area - Ground Floor


The ceiling has been painted in the Data Center and the walls have a first coat of paint.


Electrical Room


Dry wall is almost complete. Window frames are in.


Brad's Office


Looking to the 4th Floor


Curve (4th Floor)


Interested in finding out if VNET is a good fit for you?
Contact Us